Title: Changing Sleds on Jason II
Author: Mitch Elend
Category: OPS
Data Source: Visions04
File Size: 2 mb
File Type: Image (JPG or GIF)
Date Catalogued: Friday, September 9, 2005


The crane for Jason 2 picks up teh robotic vehicle to move it from the drill sled to the main working sled. This operation takes about 24 hours and requires calm seas.